encodedName: Cerca-avancada HOST: https://www.chsegura.es/va/busqueda/index.html
Canal de Youtube de la CHS
Canal de Wordpress de la CHS
Canal de LikedIn de la CHS
Canal de Facebook de la CHS
Canal de X de la CHS
Correo electrónico corporativo CHS-AGE
CIUTADÀ
LA CONCA
LA CONFEDERACIÓ
ÀREA PRIVADA
Resultados 241 a 250 de 554 (max. score: {3})
Impulsió de Crevillent
Impulse of Crevillente The elevation station consists of: L.A.A.T. 66 Kv, S/E of 66/3 Kv,a transformer of 3.000/380/220 V, three identical engine-pump groups of 1.150 cv., to 750 rpm., and 3 Kv., for a flow of 2.500 l/seg., to 25,5 m.c.a., a group of
Canal principal del marge esquerre
Crevillente pumping station Main canal on left bank Campo de Cartagena Canal Stretches A, B and C The Left Bank Main Canal is used for the irrigation of Zones III and IV, Riegos de Levante, Saladares de Alicante, Zona de la Pedrera and Campo de Carta
Trams A, B y C
Sections A, B and C ORIHUELA TUNNEL Length 4,200 m. Interior diameter 2.54 m. Close to la Pedrera reservoir there is a by-pass which enables the water to be sent directly to the Campo de Cartagena Canal or by the aforementioned reservoir. SECTION A h
Esquema general
General outline The waters coming from the Tagus-Segura Aqueduct flow, at a height of 510 m, into the Talave reservoir, located in the Mundo river, a tributary of the Segura. 85% of the volume transferred is used for supply and irrigation purposes at
Posttransvasament
Distribution canals Main canal on left bank General outline Main canal on right bank Azud de Ojos
Transvasament
Transfer The intake at Bolarque is done by means of four suction pipes with a diameter of 3.50 m, which cross the reservoir and supply the water lifting station located at its foot. The closing and protection devices of the inlet pipes are located in
Legislació del posttransvasament
de3438e1-4d78-11ea-9238-0050568d1dcb
Tarifes
Tariffs Below are the most significant fares apply in the basin of the Segura.
Tramitació de l'expedient administratiu
Administrative file procedure 5th February 1968 The Preliminary Plan for the Tagus-Segura Aqueduct is technically approved. 8th February 1968 The General Preliminary Plan is approved and the order given to make it public. 2nd March1968 It is publicly
Zones regables Posttransvasament
Distribution canals irrigable areas Distribution canal related legislation The waters coming from the River Tagus are used in the following irrigable areas of the distribution canals: VEGA ALTA AND MEDIA ZONE-I ZONE-II ZONE-III ZONE-IV ZONA-V MULA AN
Registre Electrònic General de la AGE | Ministeri per a la Transició Ecològica i el Repte Demogràfic | MCT