Configuració de cerca

Type
Mostrar más

Resultados

Resultados 291 a 300 de 561 (max. score: {3})


Presentació del projecte

Project presentation News of the project SURE YOU RIPISILVANATURA Listening: If you want to contact us to let us a query or suggestion, please send us an email to life.ripisilvanatura@chsegura.es or walk through social networks: Ripisilvanatura @ripi


Publicacions

Scientific Publications Project LIFE+RIPISILVANATURA has generated a number of scientific papers that you can download here: BRUNO et al 2019 Wate TFM CONESA NIETO Seguimiento control canya Arundo donax RIPISILVA BRUNO et al 2019 Restaurarios E1 2019


Resultats esperats

The project Expected results The main result expected is the recovery of the native riparian forest and control of IAS. As specific results we may name: Consolidation of succession stages for the reafforestation of riparian forest. Identification of


Resultats

Results Final technical report of the project Layman’s report This LIFE project has been developed in the Region of Murcia, in stretches of the Segura River located in the municipalities of Moratalla, Calasparra and Cieza. The action area includes th


Socis

The project Partners The following organizations will participate in the Project as associated beneficiaries: Confederación Hidrográfica del Segura. CHS (Segura River Basin Agency), as Project coordinator, will participate in different ways in practi


Butlletins enviats

Newsletters posted Newsletter 1 Newsletter 2 Newsletter 3 Newsletter 4 Newsletter 5 Newsletter 6 Newsletter 7 Newsletter 8 Newsletter 9 Newsletter 10 Newsletter 11 Newsletter 12 Newsletter 13 Newsletter 14 Last updated: 09/08/2017


Contacta i segueix-nos

Follow us segurariverlink @Segurariverlink Last updated: 09/08/2017


Accions del projecte

PROJECT ACTIONS PROJECT MANAGEMENT AND PROGRESS MONITORING ACTIONS (E ACTIONS) C.1 Monitoring activities. These include: Task 1: Indicators to assess how well the fish ladders are working and the extent of the improvement in river connectivity. Task


Àmbit d'actuació

Scope General map of actions Última actualización: 09/08/2017 The project comprises the section of the Segura River between Cañaverosa and Abarán (approximately 54 km), and the final section of the Benamor River up to the confluence with the Segura R


El projecte

fc318819-4d78-11ea-9238-0050568d1dcb


Certificación ENS media
Certificación ISO 27001