encodedName: Cerca-avancada HOST: https://www.chsegura.es/va/busqueda/index.html

Configuració de cerca

Type
Mostrar más

Resultados

Resultados 331 a 340 de 553 (max. score: {3})


Esdeveniments de planificació

Public Participation Events At this time the date of the following calls has been closed: Phase III. Proposal for a project to review the Hydrological Plan (Sectoral and territorial tables) Date Event Venue Status 04/10/2015 Headlines Segura and Mund


Cicle de planificació 2015-2021

ece42426-4d78-11ea-9238-0050568d1dcb


Informes de seguiment

Monitoring report The Hydrological Planning Regulation, approved by Royal Decree 907/2007, regulates in its Title III the Monitoring and Review of Hydrological Plans. Thus, in Article 87 regarding the Monitoring of Hydrological Plans, the obligation


Col·lecció de làmines

Collection of sheets of the Hydrological Plan 2015-2021 Plates corresponding to the topics developed in the Hydrological Plan 2015-2021. (Masses of water, Units of Agrarian Demand, Protected areas, pressures, environmental objectives ...). Memory sli


Disposicions normatives del pla

Normative provisions of the Hydrological Plan of the Segura River Basin District Royal Decree 1/2016, of January 8, which approves the revision of the Hydrological Plans of the hydrographic demarcations of the Western Cantabrian, Guadalquivir, Ceuta,


Pla Hidrològic 2015-2021

Annex I - Identification of water bodies related to the Natura 2000 Network. Inventory of habitats and species related to the aquatic environment Sheets Annex 09 - Analysis of the cost recovery of water services Appendix to Annex I.b - Assessment of


Col·lecció de posters

COLLECTION OF POSTERS OF THE HYDROLOGICAL PLAN 2015-2021 Published posters Poster Content Size and format Bodies of surface water The bodies of surface water of the The Segura river basin district is classified in the categories of rivers, lakes, tra


Aportacions presentades a l'Esquema Provisional de Temes Importants

CONTRIBUTIONS PRESENTED TO THE PROVISIONAL SCHEME OF IMPORTANT TOPICS With the Resolution of the General Directorate of Water, published in the BOE dated January 24, 2020, the opening of the public consultation period of the "Provisional Scheme of Im


Aportacions a la proposta de projecte de revisió del pla hidrològic

Contributions to the Project Proposal for the revision of the Hydrological Plan Contribution number Contribution 001 Allegation PH 001 002 Allegation PH 002 003 Allegation PH 003 004 Allegation PH 004 005 Allegation PH 005 006 Allegation PH 006 007 A


Estratègia d'actuació per a la reducció de nitrats en les aigües de la conca (NITRA-SEGURA)

Action strategy of the Segura River Basin Authority (O.A.) for granting authorizations and concessions for new intensive livestock farming activities and for monitoring existing facilities to reduce nitrates in the basin's waters (NITRA-SEGURA) Actio


Certificación ENS media
Certificación ISO 27001