Configuració de cerca

Type
Mostrar más

Resultados

Resultados 521 a 530 de 556 (max. score: {3})


Resum

Summary This brochure was drawn up in September 1997 using the principal determinations of the river Basin Hydrological Plan (BHP) and was distributed to make its contents known. Summary of the hidrological plan of the Segura river basin


Accés a les dades

Help manual for access to groundwater quality data Network control of underground water bodies Check the groundwater quality network in a viewer This page provides quality data for each of the measurement station:



Campanya de mostreig i anàlisi Novembre / Desembre 2006

c1bfb111-e067-11ea-8883-0050568d1dcb


Campanya de mostreig i anàlisi Novembre / Desembre 2007

ba79a958-e067-11ea-8883-0050568d1dcb


Avaluació preliminar de riscos d'inundació (EPRI)

PRELIMINARY EVALUATION OF FLOOD RISK IN THE SEGURA HYDROGRAPHIC DEMARCATION (EPRI) Second cycle (2016-2021) SECOND PLANNING CYCLE 2016-2021 In compliance with the mandate established in Directive 2007/60/CE, ttransposed into our legal system by Royal


Zones inundables i gestió del risc

d8f85989-4d78-11ea-9238-0050568d1dcb


Mapes de perillositat i risc (MPRI)

Maps of flood risk "Methodological Guide for the development of the National System for mapping of Flood Areas (SNCZI), preliminary risk assessment ”, the ministry of agriculture, food and Environment In accordance with articles 8, 9 and 10 of the Ro


Mapes de perillositat i risc (MPRI)

Flood risk maps Downloads in format SHP: Floodplains of fluvial origin with T = 500 years Delimitations and protection zones in ARPSI Downloads in format SHP: Floodplains of f


Pla de gestió del risc d'inundació (PGRI)

Annex 4. Results of public information and consultations THE PLAN OF RISK MANAGEMENT OF FLOOD THE DEMARCACION HIDROGRAFICA OF THE SEGURA Strategic Environmental Study (33,7 MB ) FIRST PLANNING CYCLE 2016-2021 Adaptation to flood risk Annex 2. Descrip


Certificación ENS media
Certificación ISO 27001