Contributions-to-the-proposed-draft-revision-of-the-hydrological-plan

Contributions to the Project Proposal for the revision of the Hydrological Plan

In the BOE of December 30, 2014, by Resolution of the General Directorate of Water, the opening of the public consultation period of the documents "Proposal for a project to review the Hydrological Plan, Draft Flood Risk Management Plan and Strategic Environmental Study" was announced, corresponding to the hydrological planning process of the Segura Hydrographic Demarcation for the period 2015-20121.

After the established term, the contributions presented are indicated below.

normas WAI-AA 2.0
normas HTML5 de W3C
normas CSS3 de W3C
licencia 'Creative Commons' 3.0